With over 20 years of experience in foster care, The National Fostering Group is the largest independent fostering agency in the UK, with the largest community of foster parents.
LP Networks have partnered with the NFG for over 6 years providing a variety of Managed and Project Services. We were asked to provide consultancy and resources to assist with their Head office move from working with their telecom’s provider through to onsite resources for the moving date.
The challenges were many with delays in the provision of Network links to the main corporate network, delays in network equipment delivery through to dealing with multiple 3rd parties around the wider Corporate network. The result of these challenges was a Head office move going live, but not linked to the core business network.
So using an agile approach and through the provision of temporary 4G routers, we worked with the client to ensure the staff were able to access the cloud applications, hosted voice platform and internal data required – until the ISP can provide the core MPLS network to site.
In summary, we engineered or provided:
Tony Holt, Financial Director (NFA Group) said 'We asked Lee Pepper Networks to help us move away from a seriously under-performing outsourced network and hosted shared server arrangement, knowing that this would be a seriously challenging project. During the course of the project, we got to know Lee and his team well, and the experience was 100% positive.'
'In particular, LP Network's technical expertise is impressive and is deployed in a highly practical way. At the planning stage, alternatives were clearly outlined and evaluated, resulting in clear guidance to us as the client.
During the transition, the previous hosted service provider caused a number of problems. Lee and his team tackled these constructively, devising imaginative solutions and always with a very positive, "can do" attitude.'
He went on to say 'LP Networks delivered reliably everything that it set out to deliver. This involved extensive travelling to our 20 UK sites and considerable out of hours working. Throughout the project, the LPN team worked seamlessly with our in-house IT team, consistently demonstrating a high level of commitment to the successful completion of our project.
The transition project was completed successfully and on time, and we now have a reliable network infrastructure, with our own servers in a data centre, supported by LP Networks. Our network has much greater resilience than previously and user satisfaction has improved hugely with the speed of data access and reliability that LP Networks has brought to our system."